Egypt

United Oil & Gas: Transformational test rate confirmed at ASH-3

Published on : 2021-02-25
ASH-3 well on EDC-50 in Abu Sanan Field on 22-February-2021


UOG announced a much-anticipated update on the testing of the ASH-3 development well in the Abu Sennan concession, onshore Egypt.

The Company holds a 22% non-operating interest in Abu Sennan, which is operated by Kuwait Energy Egypt.

The ASH-3 development well, a step-out development well in the ASH Field, spudded on 4 January, and reached a total depth (TD) of 4,087m MD (3,918m TVDSS) on 8 February, ahead of schedule and under budget.

Logging indicates a gross hydrocarbon column of 59m in the primary AEB reservoir target, 27.5m of which is estimated to be net pay.

"ASH-3 was successfully tested from the targeted AEB Formation, and preliminary results indicate maximum flow rates of 6,379bopd and 6.7MMscf/d (c. 7,720boepd gross; 1,700boepd net working interest) on a 64/64" choke. Rates of 3,561bopd and 2.9MMscf/d (c. 4,140boepd gross; 910boepd net working interest) were achieved on a reduced 30/64" choke, and in line with prudent reservoir management, these rates are expected to be more representative of the sustainable flow levels that will be achieved when the well is brought onstream through the existing ASH facilities."Ahmed AbdElshafy Saudi, well test engineer, Pico, told Petroleum Today.

The ED-50 rig will now move to the north of the Licence, close to the producing Al Jahraa field to commence the drilling of the ASD-1X exploration well.

This well is targeting the Abu Roash reservoirs in the Prospect D structure and, if successful, can quickly be brought into production.

Related Articles

Egypt, Italy probe cooperation in petroleum, renewable energy fields

According to a statement on April 22nd

Read More

Shell Egypt and Partners Launch 11th Phase Development in Nile Delta Offshore Concession

Shell Egypt, along with partners EGAS, EGPC, and Petronas, have agreed to commence the 11th development phase in Egypt Nile Delta offshore West Delta Deep Marine (WDDM) concession in the Mediterranean Sea.

Read More

El Molla Reviews Methanex Plant Progress: Boosting Methanol Production and Sustainability

Minister of Petroleum and Mineral Resources Tarek El Molla recently inspected progress at the Methanex plant in Damietta, reviewing state-of-the-art facilities and production units designed for maximum safety and global sustainability

Read More
Wintershall Deaneptune LogoSIEnppipetrojetTransGlobe SCHNEIDER-ELECTRIChempleEgypt gasNorthAlmansooriSKY CTS exxonmobilSchlumbergerhttps://www.shell.com/GascoCPCAlmansoori